Capabilities – Mini-Excavator going to work!

We are increasing our capabilities to self perform work for our customers.

Our new Bobcat E42 Excavator is going to work for us at our current project with the Town of Marana, AZ.

Kappcon is your partner in success!

New excavator, adding capabilities
New excavator, adding capabilities!

Next up for the E42: replacing an existing basketball court slab with a new post tension slab in McNeal, AZ.

Athletic Field Construction

A step by step view of how we built the University of Arizona Campus Recreation Dave Sitton Field.

All site work, utility, grading, paving, drainage, concrete wall, root zone, green wall was by Kappcon, Inc.

Natural turf was by UA Facilities Management Grounds Services

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

New Senior Housing Construction for local Tribal Nation

 

Excellent new housing for Senior’s of the Pascua Yaqui Tribe!

 

Yaqui-03 low

 

  • This senior housing construction project has 20 units.

 

Yaqui-04 low

 

  • Three different floor plans.

 

Yaqui-05 low

 

  • Phased Construction delivery.

 

    Yaqui-06 low

 

 

 

  • Complete new site utilities

 

Four Five-Plex  Units for The Pascau Yaqui Tribe

 

  • Turnkey project – Site Development, Building Shell, Interior Improvements, Landscaping.

 

Yaqui-02 low

Three Points Fire Station #303

Kappcon is very happy to deliver a new Fire Station for the Three Points Fire District.  They have a great vision!

3 Points Fire Station-5 s
Station #303, near Robles Junction
3 Points Fire Station-6
This crew is ready to serve the people of Three Points!
These 2 apparatus bays are ready to respond!
View from Sasabe Road

 

3 Points Fire Station-4 s
Front Entrance
A high functioning kitchen
A high functioning kitchen
3 Points Fire Station-2
Interior space for living and working

 

3 Points Fire Station-9
Plenty of covered space
3 Points Fire Station-10
These lockers will keep the gear organized
3 Points Fire Station-1
A space for the Board to meet

Upgraded: Our new Robotic Total Station

For the past 10 years, we have built up our capabilities with a mechanical Total Station.  This tool has forever changed the way we layout foundations, sites, and intricate architectural features.  We have now taken the next step and upgraded to a robotic total station.  We will be using this for construction staking, precision layouts, as built documentation, and more.

This is how we use BIM to everyone’s advantage on the job site.  Read more about Total Stations here.


Robotic Total Station-09 sRobotic Total Station-04-2 s  

Kangaroos at our Construction Site!

It’s not everyday you meet a couple of Roos on the road to your Observatory Building project – however, this was quite common for the team at the KMTNet in Siding Spring Observatory!  We sure had fun with the challenges of the this Design-Build observatory construction project…

Three Roos
Three Roos
Paving the driveway to the KMTNet in Siding Spring Observatory, AU.
Paving the driveway to the KMTNet in Siding Spring Observatory, AU.
Bank protection for this severely sloped sight at Siding Spring Observatory
Bank protection for this severely sloped sight at Siding Spring Observatory
Crane Lifting 40' High Cube Container with Telescope Parts
Crane Lifting 40′ High Cube Container with Telescope Parts
Lifting the base assembly for KMTNet in Siding Spring Observatory, AU
Lifting the base assembly for KMTNet in Siding Spring Observatory, AU

Observatory Construction in South Africa

About one year ago, the team from Kappcon traveled to the South African Astronomical Observatory in Sutherland, South Africa.  It was an amazing work trip full of long days, cooperation, and problem solving.  This was a truly great team effort.  The telescope is one of three for the Korean Microlensing Telescope Network.

This was part of the Design-Build observatory construction contract that Kappcon has recently completed.

These telescopes will be detecting a lot of planets in the near future.

Team at Sutherland

Team at Sutherland