Rocking K Splash Pad

A new Splash Pad is coming for the new Rocking K Park.  Kappcon is constructing an Arizona shaped Splash Pad that will serve the new 600 home community off of Old Spanish Trail.  It will be the shape of the State of Arizona.  Our team is doing a great job, we can’t wait to see it completed.

 

 

Completed Project: Himmel Park Playground

In 2018, Kappcon and the City of Tucson Parks & Rec department teamed up to breathe new life into Himmel Park. There are now designated play zones for younger and older children as well as picnic tables, water fountains and shady areas for parents. Parents will also be pleased by the new concrete pathways that allow strollers to easily access different points within the park.

 

Himmel Park Before and After

 

Most importantly, the beloved metal slide community members rallied to protect is still standing. Tucson kids will be able to zoom down the freshly painted retro slide for decades to come!

Himmel Park 5

The Project Team: Owner Nathan Kappler and Project Engineers Matt Altamirano and Ben White

 

Thank you to the Tucson community for your support throughout this project. It is one of our favorites of 2018!

See the lovely write up from This is Tucson for more pictures!

 

Completed Project: Splash Pad at Crossroads Park

This Splash Pad was a Design Build project partnerships between Kappcon General Contracting, McGann and Associates, Aqua Design International, M3 Engineering, and Shade Industries.

We self performed the following Construction scopes:

  • Total Station Layout
  • All Cast in Place Concrete
  • Splash Pad Equipment
  • Splash Pad Plumbing
  • Splash Pad Electric
  • Steel Stud Framing

 

Splash Pad in Marana’s Crossroads Park

Two things in high demand during the Tucson summer:  Water to Splash, and Shade from the Sun!

Kappcon was the proud Design Builder of a new Splash Pad that we hope families will enjoy for many  year to come.

News Coverage of the Grand Opening

This is what the project looked like hours before the Grand Opening…ready for all those kiddos!

 

 

Splash Pad at Crossroads: June Update

Have Some Concrete with Your Rebar

The new splash pad at the Crossroads at Silverbell District Park is coming right along. The fountain heads are in place and concrete is being poured over an impressive rebar mat (see the photo above!). Then, we will hoist up the shade sails and test ‘er out!

Splash Pad Rendering
The current jobsite and a rendering of the completed splash pad by landscape architects McGann & Associates.

 

Another fun fact about the splash pad is that on designated nights, it will double as an LED light and water show for park patrons. Speaking of light shows, stop by the Town of Marana’s July 4th Star Spangled Spectacular for some family fun.

Keep an eye out for these banners!

Jobsite Banner
Banners designed by the Town of Marana that engages the public and proudly features all trade partners.

 

 

Planning a Neighborhood Ramada – Historic Renovation

Update – Project complete and dedication

Update 11/28/16 – Progress picture and article from Arizona Daily Star

Working with a fantastic neighborhood that is passionate about saving a piece of history.  This neighborhood has salvaged beautiful glazed roof tiles from a near by demolition of a historic ranch house in mid-town Tucson.

They now are now planning a presentation of those historic tiles on a new park ramada structure.

Kappcon is pleased to be working with this team to ensure a quality result within a tight budget.

Tahoe Park Ramada
IMG_5502 IMG_5501IMG_5500 IMG_5499 IMG_5504 IMG_5503

CVNA History 3 CVNA History 1CVNA History 2

Capabilities – Mini-Excavator going to work!

We are increasing our capabilities to self perform work for our customers.

Our new Bobcat E42 Excavator is going to work for us at our current project with the Town of Marana, AZ.

Kappcon is your partner in success!

New excavator, adding capabilities
New excavator, adding capabilities!

Next up for the E42: replacing an existing basketball court slab with a new post tension slab in McNeal, AZ.

Athletic Field Construction

A step by step view of how we built the University of Arizona Campus Recreation Dave Sitton Field.

All site work, utility, grading, paving, drainage, concrete wall, root zone, green wall was by Kappcon, Inc.

Natural turf was by UA Facilities Management Grounds Services

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field

UA Student Rec Center - Athletic Field